Classic Armour Back Cover for Poco X5 5G (6.67") | Shockproof Protection | Classic Designed Case | Armor Case

NO REVIEWS

Color: CLEAR
Price:
Sale priceRs. 250.00

Free shipping & tax included.

Stock:
In stock (23 units), ready to be shipped
Delivery:
  CHECK
Orders before 1:00 PM are shipped on same day.

   SAVE BIG WITH ONGOING OFFERS

  UPI Savings: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
  Axis Bank Cards: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
  HDFC Bank Cards: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
  ICICI Bank Cards: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
  SBI Bank Cards: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
  Kotak Bank Cards: 3% off, applicable for purchase above Rs 299. 6% off, applicable for purchase above Rs 549. 10% off, applicable for purchase above Rs 999. Offer valid until 30 SEPT 2026.
 
Cash On Delivery
  
Free Delivery
 
Return Policy
 
Assured Quality
 
Secured Transaction

Description

  • COMPATIBILITY ➤ Designed specifically for Poco X5 5G (6.67 Inches).
  • MAXIMUM FULL ARMOR PROTECTION ➤ 2 in 1 dual layered hybrid design composed of poly carbonate exterior shell soft thermoplastic polyurethane inner cushion provides extra protection to the back, side and corners from accidental drops, impact, dust, dirt or other damage, offering superior shock absorption with ultimate protection for signal. The anti-scratch coating is applied to prevent wear and tear from long term use.
  • EXCELLENT GRIP ➤ The durable high-grade material offer comfortable feeling and wonderful grip to prevent slip.
  • PERFECT FIT ➤ Easy access to all buttons and ports, matching the phone perfectly. Besides, the individual buttons of mixed color design offers sensitive response and lively sense.
  • SCREEN AND CAMERA PROTECTION ➤ Raised bumper lip higher than the screen, lift the screen off flat surface, protect the screen AND camera from scratches.
  • WIRELESS CHARGE ➤ Wireless charging compatible with full access to all ports AND functions.
  • ENVIRONMENT FRIENDLY ➤ Made with recyclable material and designed to last long.
  • ALSO KNOWN AS ➤ Back Cover, Back Case, Mobile Back Case, Mobile Back Cover, Classic Armour Case

Return & Replacement

Return & replacement available (7 Days) Read...

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

YOU MAY ALSO LIKE

RECENTLY VIEWED